K402

  VIRTUAL TOUR

Accept cookies to view the 3D tour.

Accept cookies to view the 3D tour.

An elevator control panel with arrows pointing up and down, and the words 'SCRALL HERE' written vertically, with the letters 'H' and 'E' at the bottom.

   K402   

3 rooms + living room

 - Net area - 

  150,0m  

  (144.9m)  

 Terrace 

  22,00m  

  (30.71m)  

I am interested

1. Hall

2. Kitchen

3. Toilet

4. Househ.

5. Bathr. I

6. Bedroom I

7. Livingroom

Room list

4.67m2

22.34m2

1.25m2

5.23m2

4.46m2

17.45m2

28.53m2

8. Corridor

9. Wardrobe

10. Bathr. II

11. Bedroom II

12. Corridor

13. up. Bedroom III

14. Roof terrace

10.14m2

7.03m2

10.98m2

15.30m2

4.64m2

12.87m2

30.71m2

Floor plan of the ground floor of a luxury apartment, with a large living room, bedroom, walk-in closet and bathroom belonging to the bedroom.
I am interested
  • CLT technology-engineered wood structure.

    20-30 cm of rock wool insulation and Daikin cooling-heating fan coils ensure a perfect thermal sensation.

  • Top-of-the-line, triple-layered Internorm windows and doors.

    Aluminum cladding on the outside for durability, with a thick wooden frame inside for maximum comfort and aesthetics.

  • The Loxone smart home system represents the highest quality available on the market! Our apartments are equipped with a comprehensive smart home service.

    • Control of blinds and automatic window opening.

    • Room-by-room temperature and humidity sensing.

    • Programmable lighting scenes.

    • iPad control

Brief technical description:

In Budapest's 5th district, on Kecskeméti Street, a classicist apartment building has been renovated with roof extension and facade restoration. The CLT structure extension includes 10 new, uniquely designed apartments with a panoramic elevator, storage units, and a comprehensive smart home system.

The apartments have modern appliances, heat pump underfloor heating, fan-coil cooling and premium windows. All apartments have terraces. They are sold without tiling and can be personalised. Construction is 95% complete, with delivery expected in December 2025.

Full technical description